Monday 7 January 2019

Year in Review - 2018 Winkens Architecture



The year began with a completion of a BER A2 Bungalow in Bunclody, Co. Wexford in January.


We continued to concentrate on the  residential sector.





In June the office purchased a MAVIC AIR Drone.

Aerial photos are great to get a bird’s eye view.

This one near Kilmuckridge, Co. Wexford.








The last 6 dwellings designed or completed in 2018 are low energy designs, 
2 with BER A1 and 
4 with BER A2’s.
All are nZeb compliant.

This one is a BER A2 Bungalow on a hill in Bunclody, Co. Wexford.





Passive House Plus published our second Certified Passive house with a BER rating of A1 in their Issue 27 2018. 






This photo was taken in December 2018. Dormer with a preliminary BER of A1 with 4kw of Photo voltaic and a Battery system.
We could not do what we do without good clients who trust our expertise. We have been very fortunate having clients that choose us to design and supervise their builds.
We look forward to continue designing low energy dwellings in 2019 and beyond.

Twitter:   Zeno the Architect @winkenswexford

Read my colleague's blogs on the subject:


#ArchiTalksIE
By using this hashtag on twitter, or links provided within each blog itself, you can connect to the other architect’s blog on the same topic. Our blogs will be posted synchronously on the same time same day. We hope you will enjoy this format and benefit from the broad professional views and different approaches to the same issues.

What's a typical timeline to design and build a house?     #ArchitalksIE Winkens Architecture approach: This is based on our exper...